11-13-08 Steel Beams being Unloaded Steel beams were delivered today to the construction site, with the unloading assistance of more "unusual-looking" equipment! The building should really start gaining height and structure soon. Check back regularly for more progress.
11-12-08 Laying 2nd floor block Amazing daily progress is visible as the walls are layered higher and higher by masonry workers, with window areas enclosed in some areas. The "rounded" part of the building is more visible, and the stairs are now concrete.
11-06-08 Video of Windows, Walls, Ramp, Stairs, and more This video shows our site is beginning to take the shape of our Children's Building with some walls and window areas, ramp and stairs, as well as more concrete flooring poured in the "rounded" area of the new building toward the intersection.
10-28-08 Smoothing Floor On Tuesday, October 28, our site was busy with quite a number of workers smoothing the recently poured concrete floor of the Children's Building.
10-22-08 Plumbing and Concrete Floor Video Plumbing and concrete floors are now evident in the construction progress on the Children's Building. This Video is panning from side to side of the building site.
10-14-08 Sidewalk Finished

 

View larger photo of image at left.

10-13-08 Sidewalk Preparation

 

View larger photo of image at left.

10-02-08 October 2, 2008 Check out the continued progress as new layers of block continues to be laid, and carefully examined.
09-25-08 Video -- spanning site Video of the week -- panning left to right on the site, which shows the perimeter of the building and walls getting higher.
09-23-08 Children's Building - Walls Higher

On Tuesday, September 23, the walls of the Children's Building are getting higher and the building is taking shape around its perimeter!

View larger photo of image at left.

 

09-16-08 Pouring Cement into Footings On Tuesday, September 16, our site was busy with quite a number of workers beginning to lay block on some of the footings, while another team of workers was busy preparing a trench and piping for electrical conduits.
09-10-08 Pouring Cement into Footings In the early morning of September 10, cement began to flow into the footings of the Children's Building, with some hard-hat supervision and inspection.
09-10-08 Cement Spread (Click to view larger image)

Photo of the day... smoothing fresh cement in the footings.

View larger image of photo at left.

08-21-08 Footings preparation (video) A bird's-eye view video of the continued progress in preparation for footings for the Children's Building.
08-15-08 Bringing Water across Partin Drive

Bringing water across Partin Drive Photo Gallery On Friday, August 15, water pipes were brought "under" Partin Drive So. from the east side to the west side for the new Children's Building, using a "directional rig".

08-12-08 Video of the Day (August 12, 2008)

Video of the Day With "central command" of building plans on sawhorses in the middle of the site, workers continue to dig and displace dirt accordingly in preparation for the footings.

View larger image of photo at left

08-12-08 "Central Command" "Photo of the Day"... Reading plans in "central command" in the middle of the construction site.
08-08-08 Surveying

"Photo of the Day"... More surveying and positioning markers for the building. (Taken from church office doorway)

07-30-08 July 30, 2008 Construction "Groundwork" Video
07-24-08 Cook Family with "Cross-Tree" Cook Family with "Cross-Tree" Photo Gallery
07-24-08 Removing the brick wall outside the Offices Clearing the Construction Area Photo Gallery
07-10-08 Groundbreaking for Children's Building Groundbreaking for our Children's Building Photo Gallery